Central Vacuum System - CD
Project:

In 2008 Disan installed a central vacuum system in the new BMW plants in Munich, where is located the R&D department and manufacture of F1 cars. In particular are equipped with central vacuum all the “white rooms”, the labs and the offices.

The central unit is a CD125i for 4 simultaneous users. 

 

Installed product; Central Vacuum System - CD

Project details:

Application: Laboratory

  • Surface 9.500 m²
  • Inlet valves 200
  • Pipes 1.500 m
BMW World
BMW World
Contact us