Miscellaneous references

BMW World
BMW World
München, Deutschland
Central Vacuum System Disan CD125i
Project details:

Application: Laboratory

  • Covered surface: 9.500 m²
  • Pipes: 1.500 m
  • Inlet valves: 200

System: Central Vacuum System Disan CD125i

Rolex SA
Rolex SA
Genf, Switzerland
Central Vacuum System Disan EF125i
Project details:

Application: Headquarter

  • Surface 41.000 m²
  • Simoultaneus users: 52
  • Length of pipe ca. 6,000 m
  • Inlet valves 592 Stk.

 

System: Central Vacuum System Disan EF125i

Palm Jumeirah
Palm Jumeirah
Dubai, United Arab Emirates
Central vacuum system Disan A01 100l - 125l
Project details:

Application : Luxury villas

  • Surface 2500 m²
  • Length piping ca. 540 m
  • Inlet valves ca. 76

System: Central vacuum system Disan A01 100l - 125l

Vincci Seleccion Buena Vista
Vincci Seleccion Buena Vista
Tenerife, Spain
Central Vacuum System Disan F03 125l
Project details:

Application: Large hotel Komplex 

 

  • Surface 57.000 m²
  • Simoultaneous users: 48
  • Length of piping ca. 20.000 m
  • Inlet valves 1.200 Stk.

 

System: Central Vacuum System Disan F03 125l

Hotel Chang Fu Gong
Hotel Chang Fu Gong
Peking, China
Central Vacuum System Disan D02
Project details:

Application : Hotel

  • Surface: 19.900 m²
  • Simoultaneus users: 20
  • Lenght of pipes: 2.400 m
  • Inlet valves 320 Stk

System: Central Vacuum System Disan D02

HOUSE OF MUSIC
HOUSE OF MUSIC
MOSCAU, Russia
Central Vacuum System Disan F03 125l
Project details:

Application : International Theather 

  • Surface 13.000 m²
  • Simoultaneus users : 18
  • Length piping ca. 1.650 m
  • Inlet valves 220 Stk.

 

System: Central Vacuum System Disan F03 125l

WONKWANG UNIVERSITÄTSKLINIKUM
WONKWANG UNIVERSITÄTSKLINIKUM
Soul, South Korea
Central Vacuum System Disan H02
Project details:

Application: University Hospital

  • Surface : 15.000 m²
  • Simultaneous users : 8
  • Length of pipe : 2.300 m
  • Inlet valves 290

System: Central Vacuum System Disan H02

Parliament
Parliament
Ottawa, Canada
Central Vacuum System Disan BC100i
Project details:

Application : Parlament

  • Surface 13.500 m²
  • Simoultaneus users : 8
  • Length piping ca. 1200 m
  • Inlet valves 130 

System: Central Vacuum System Disan BC100i

Royal Palace
Royal Palace
Kuala Lumpur, Malaysia
Central Vacuum System Disan D02
Project details:

Application : Royal Palace

  • Surface 15.000 m²
  • Simoultaneus users : 18
  • Length piping  4.300 m
  • Inlet valves 544

System: Central Vacuum System Disan D02

Ismaili Center
Ismaili Center
Dubai, United Arab Emirates
Central Vacuum System Disan C03
Project details:

Application : Religiöse Einrichtung 

  • Surface 7.500m²
  • Length piping  ca.  1.300 m
  • Inlet valves ca. 180

System: Central Vacuum System Disan C03

Contact us Warranty - registration Follow us